This project provides site preparation and installation of several Electric Vehicle Charging Stations at four separate locations.
DOWNLOAD PDFThe project proposes to replace failing water, sewer, and stormwater mains on NE 185th St from Bothell Way NE to Beardslee Blvd. The roadway pavement section will also be completely rebuilt which will require the installation of new concrete vaults, PVC conduits and fiber optic cable.
Learn moreThis project provides site preparation and installation of several Electric Vehicle Charging Stations at four separate locations.
Learn moreWe are an experienced firm specializing in government and infrastructure